Overview picture of Hamnbanan.

The Gothenburg Port Line

The Gothenburg Port Line is currently a single-track railway line. In order to meet the demands of growing transport needs, the Port Line needs to be expanded to a double-track line.

The Gothenburg Port Line – an important railway link

The Gothenburg Port Line is one of Sweden's most important railway links. The track makes it possible for freight traffic from across the Nordic region to reach the harbour districts in Gothenburg. The almost 10 km line is today a single-track line with too low of a standard to meet future traffic needs. An expansion of the Port Line to double-track is required in order to increase both the amount of rail traffic and the total amount of freight traffic.

The Gothenburg Port Line is a goods-only railway. It runs through southern Hisingen, occasionally through heavily developed areas, such as residences, schools, and nature areas. After passing under the Älvsborg bridge, the track heads west through an industrial area with oil refineries and depots. Different types of goods – including hazardous materials – are transported along the track to vessels in Gothenburg Harbour and the surrounding industries. The Gothenburg Port Line is funded and operated by the Swedish Transport Administration.

The future of the harbour is on land

Gothenburg Harbour is the Nordic region's largest harbour and a natural centre for freight traffic in Scandinavia. 60% of Sweden's container traffic and 35% of the country's foreign trade goes through here. The mode of transport that is most efficient from an environmental and an economic perspective is a combination of shipping and rail. Heavy rail traffic between the harbour and various locations in Sweden make it possible for businesses around the country to have quick, cost effective and environmentally smart connections with the Nordic region's largest harbour.

The Gothenburg Port Line – built in different sections

The Gothenburg Port Line Project consists of several sections that will be carried out during different periods of time. In the next paragraph you can read more about each section:

  • Pölsebo–Skandiahamnen
  • Eriksberg–Pölsebo
  • Kville bangård (Railway yard)

Overview map of between Pölsebo and Skandiahamnen.

Pölsebo–Skandiahamnen

Construction of a new track parallel to the existing track will be carried out on the stretch between Pölsebo and Skandiahamnen. The stretch runs through a major industrial area with oil refineries and petroleum industries. There are several factors to take into consideration during construction, for example rock shelters, gas pipelines and other environmental zones.

Eriksberg–Pölsebo

A new double track railway tunnel is to be constructed under the Eriksberg district. The new double track will branch off from the current single track immediately after the Eriksberg junction. After that, the tracks enter an approximately 1.2 km long tunnel. The tunnel will go through Bratterås, under and through Krokäng, and exits into the Pölsebo railway yard, where the double track connects to the current altitude and the expansion westward. The connection will be located somewhere on the stretch between the tunnel entrance and the Älvsborg Bridge, depending on the elevation of the track. After that the track splits into the Rya Line, the Skarvik Line, and the Höke railway yard as well as continuing westward.

The location of the tunnel will be adapted to the terrain so that as much of the tunnel as possible will be constructed through rock. This will primarily be the case through Bratterås and under Krokäng. Other stretches of the track will consist of concrete tunnels and open troughs. The surrounding land will be adapted to the landscape.

At the section where a football field is located today, the roof of the tunnel may be a few metres over the current ground level. The football field will be reinstated in almost the same position as today. The old track between Nordviksgatan and Londongatan will be demolished and the ground will be modified and restored to the surrounding area.

Train on the railway.

The area surrounding the planned tunnel is characterised by urban centres with houses, apartments, schools and nature areas. During construction of the new tunnel, careful consideration will be taken with regards to the nature areas in the district and measures will be undertaken to reduce noise and vibrations. Restoring both park and local environments after the tunnel work is completed, will be an important process. Rail traffic will run as usual while the tunnel work is in progress. 

Kville bangård

The railway yard was rebuilt in 2015-2016 in order to make more simultaneous train movements and future higher speeds possible. In the new yard it will be possible for an increase in the traffic load on existing tracks and the yard is now adapted to supplement the new bridge over Göta älv, the Marieholms Bridge. We have replaced approximately 25 switches in the eastern and western switch zones and adjusted the connections to existing tracks.